The frame is then left to rest for 24 hours before the inspection and polishing phase which takes place entirely by hand.
The final step is the application of the new generation Decaplus decals which are applied using water and then cooked in the oven.
The new graphics have been specifically designed to reduce weight, allowing for a perfectly smooth surface and offering exceptional finishes like the metallic ones visible in these photos.

The frame is cleaned and checked one last time before being passed to the technical team which make a further check on the threads, seat post and fork. Only after passing all these phases will the frame then be sent to the customer to be built up as their dream bike.

Only after passing all these phases will the frame then be sent to the customer to be built up as their dream bike.
